Case study · Edmonton · Drill holes for retaining wall

Seven holes drilled for a retaining wall in Edmonton

Seven 450mm holes, 1m deepWacker Neuson SM100 track loaderStalled job back on track
7 holes drilled
450mm wide, each hole
1m deep, each hole
On site

Watch the whole job

The full job in 33 seconds. Drag to scrub.

Two clips from the drilling, in the order they were filmed.

0:00 / 0:33
Tight to a shed and a fence, Drill holes for retaining wall in Edmonton

The tricky bit

Tight to a shed and a fence

Next to a fence and a building you keep an eye on your swing and your spoil. The red soil stayed mounded where it was out of the way.

How we did it

The job, start to finish

  1. Edmonton work site showing a track loader and mound of red soil along a shed for retaining wall ground works

    Set up along the shed

    The Wacker Neuson SM100 track loader working along the edge of the shed, with red soil mounded beside it.

  2. Drill on the front, Drill holes for retaining wall in Edmonton

    Drill on the front

    The drill fitted to the front of the compact track loader, ready to go down.

  3. Drilling beside the shed, Drill holes for retaining wall in Edmonton

    Drilling beside the shed

    Drilling down beside the shed wall, with the red soil coming up as the hole goes in.

  4. One hole done, Drill holes for retaining wall in Edmonton

    One hole done

    A drilled hole in the red soil, one of the seven along the line the wall will follow.

  5. Spoil kept clear, Drill holes for retaining wall in Edmonton

    Spoil kept clear

    Red soil lifted out and kept mounded clear of the hole, so whoever builds the wall has clear access.

  6. Edmonton operator at the controls of a yellow Wacker Neuson SM100 track loader in a backyard

    Tight machine for the backyard

    At the controls of the SM100 in the backyard. It is a tight machine, which helped in a yard like this.

The result

Ready for the wall to go up

Seven 450mm holes, each 1m deep, drilled along the shed. The site was left ready for the new retaining wall to go up, with the job back on track after being stalled.

Suburb
Edmonton
Job type
Drill holes for retaining wall
Holes
Seven, 450mm wide, 1m deep
Machine
Wacker Neuson SM100 track loader
Completed
14 Oct 2026
Full job notes

From a stalled job to seven holes drilled and ready for the new wall.

The client in Edmonton needed holes drilled for a new retaining wall. Their previous contractor had let them down more than once, so the job had stalled before we got the call to drill the holes for the retaining wall and get it moving again.

We got on site and worked along the edge of a shed. The ground here is red soil, and you can see it piled up next to the shed once we started. We used our Wacker Neuson SM100 compact track loader for the work.

The job was seven holes, each 450mm wide, drilled down to 1m deep. That depth gives the new wall something solid to sit on. The holes run along the line the wall will follow, close to the shed and the boundary fence.

Working next to a fence and a building means you keep an eye on your swing and your spoil. We kept the red soil mounded where it was out of the way, so whoever builds the wall has clear access to each hole. The SM100 is a tight machine, which helped in the backyard with the shed on one side.

It's straightforward work, but it has to be right. If the holes are off line or short on depth, the wall builder is stuck.

Once the holes were in, the site was ready to hand over for the retaining wall to go up.

Edmonton backyard with a Wacker Neuson SM100 track loader beside a shed and freshly excavated red soil Edmonton work site showing a track loader and mound of red soil along a shed for retaining wall ground works Edmonton operator at the controls of a yellow Wacker Neuson SM100 track loader in a backyard

What was included

  • Took over the job after the previous contractor fell through
  • Drilled seven 450mm holes using a Wacker Neuson SM100 track loader
  • Drilled each hole to 1m deep
  • Worked along the edge of the shed and boundary fence
  • Kept excavated red soil mounded clear of the work zone
  • Left the site ready for the wall to be built